B8 Field Development Petrobaltic Drilling Rig Conversion Project

Status: Work in progress

Scope of Work

Detailed Engineering - Follow-up - enginenering supoort to procurement and construction activities

Project Description

​Lotos ​​​Petrobaltic​ drilling rig conversion to production hub

Technical Details

Type of plant:

  • Jack-Up conversion to Production platform
  • 6 production well on jack-up
  • 3 subsea water injection well

Engineering man-hours: 320.000 

Water Depth: 328 ft

Production:

  • Crude Oil  1.200 SMCD
  • Gas 135.000 SMCD
  • Water 1.700 SMCD

Operating pressure:

  • Inlet crude operating 9-20 bara
  • Gas export 120 bara
  • Water injection 380 bara @ wellhead

Temperature:  Inlet crude operating 12-20 °C

Weight:

  • New Structures 1.700 Ton
  • Equipment's 1.315 Ton