Fauzia Field

Status: Completed

Scope of Work

Feasibility Study

Project Description

​​​​Fauzia wellhead Gas​ Platform

Technical Details

Type of plant: Production platform

Engineering man-hours: 5.500

Water Depth: 230ft

Production:

  • Gas 260.000 Sm3/day
  • Water 4.218 Sm3/day

Operating pressure: 156,9 bara

Temperature: 5.3@22.8 °C