IKA Field Development - IKA JZ Platform

Status: Completed

Scope of Work

IKA JZ Platform Topside facilities detailed design

Project Description

​Platform designed to handle gas and produce water from the IKA field reservoir through five double completion wells.

Technical Details

Type of plant: Production Platform

Engineering man-hours: 39.000

Water Depth: 576 ft


  • Gas 523.000 Sm3/day
  • Water 7,1 Sm3/day

Operating pressure: 20÷17,1 barg

Temperature: 20 °C

Focus: Photovoltaic electric generation