Libondo Field

Status: Completed

Scope of Work

Detailed Design - engineering support to procurement and construction

Project Description

  • ​​Platform LIB1 wellhead platform
  • Topside facilities
  • Kombi/Yanga topside facilities upgrading

Technical Details

Type of plant: Oil Production Platform

Engineering man-hours:  33.000

Water Depth: 370 ft

Production:

  • Crude oil 1.800 Sm3/day
  • Gas 63.768 Sm3/day
  • Water 4,5S m3/day

Water Injection: 1.600 Sm3/day @ 150 bara

Operating pressure: 130 bara

Temperature: 75 °C

Focus:

  • MV Submarine cables (30kV)
  • Endorsement of FEED package provided by Company
  • Topside facilities multidisciplinary detailed engineering for Libondo LIB 1 platform
  • Topside facilities multidisciplinary detailed engineering for Kombi / Yanga platforms