Litchendjili Field

Status: Completed

Scope of Work

Conceptual Study

Project Description

​​​​​Congo Marine XII Litchendjili - New Platform Deck and  Jacket​

Technical Details

Type of plant: Oil & Gas production

Engineering man-hours: 15.300 

Water Depth: 125ft

Production:

  • Crude Oil flow rate peak 1.400 bbl/day
  • Gas flow rate peak 2 MSCMD
  • Condensate  flow rate peak 4.785 bbl/day

Operating pressure:

  • Oil 280 bara
  • Gas 360 bara