Scope of Work

Feasibility Study and Basic/FEED Engineering

Project Description

​​Gas production wells, gathering system, 4 Km 10" multiphase pipeline connecting the well area to the treatment plant, gas and condensate treatment plant.

Phase 1: Feasibility study and costs estimation

Phase 2: Multidisciplinary basic design, EPC tender and Report for Authority​

Technical Details

Engineering man-hours: 21.700

Gas Production: 1.200.000 Sm3/d

Main process units: ​3 ph separation, gas dehydration, condensate storage