Marlin Development Project

Status: Completed

Scope of Work

Detailed Engineering for EPC Contractor - engineering assistance to procurement and follow-up activities

Project Description

​Marlin Oil & Gas Platform -  Topside facilities detailed design

Technical Details

Type of plant: Production Platform (Manned)

Engineering man-hours:  140.000

Water Depth: 362ft

Production:

  • Crude Oil & Condensate 4.000-10.000STBPD 26°-47°API
  • Gas 156 MMSFCG 0.61-0.65 S.G.
  • Water 100-8.000BPD 1.023 S.G.
  • Total Liquid 12.000 BPD Max

Operating pressure: 76 barg

Temperature: 66 °C

Weight: 4.600Ton –Operating Condition

Focus:

  • Power generation with 3 SOLAR turbo-generators
  • H.P. gas compression with 2 SOLAR turbo-compressors
  • 3 Separators (HP, IP,LP)
  • Oil treatment
  • Gas treatment (Glycol dehydration and regeneration unit)
  • Water treatment plants (Water skimmer & Gas flotation)
  • Full pneumatic control system
  • 3 floors living quarter – 20 POB
  • Helydeck