R/82-A/100 Pipeline Replacement Project

Status: Work in progress

Scope of Work

Detailed design, engineering to procurement, project management services

Project Description

​​​​​​​​​New 80 km 12" pipeline connecting R/82-A/100 oil fields and replacing the existing corroded pipeline.

Pipeline diameter optimization study (if pipeline smaller than 12'' thermo-hydraulically acceptable)

Technical Details

​​Engineering man-hours: 18.000​